Introduction
The Afar Water Irrigation and Energy Bureau has prioritized providing safe and accessible water supply services to rural communities in Dulesa, Argoba, Semurobi Gelealo, Ewa, Golina, Dalol, Erebti and Gereni Weredas. In many cases, people in these areas rely on unprotected water sources, leading to poor hygiene and disease. Women and children often bear the burden of fetching water from long distances. The first phase involves in-depth investigations to identify potential borehole sites for groundwater resources suitable for domestic consumption. Table 1 shows the target depth and location of each site. Once completed, the project aims to reduce the cost of healthcare and increase time for other developmental activities. Ultimately, access to safe and adequate water supply will improve the well-being of these rural communities.
Objective of the Study
General Objectives
The general objective of the project is to conduct comprehensive groundwater resource investigation and hence pinpointing the promising borehole sites. Thus, the final target of the project is avail sustainable, safe and adequate water supply to the community there by contribute to the increase of the water supply and sanitation coverage of the region and the country as a whole.
Specific Objectives
-
To examine the local groundwater potential (hydrogeological setting) of the area through characterizing the geology, geomorphology, drainage and complementing the finding from resistivity survey;
-
To produce various groundwater occurrence controlling factor maps;
-
To pinpoint the potential groundwater sites;
-
To put forward both technically and financially viable recommendation;
-
To setup preliminary design that depicts:
The estimated drilling depth with the corresponding diameter;
The nature and character of subsurface geological formation to be encountered;
The methods of drilling to be employed; and
Type and capacity of the drilling machine and its accessories to be deployed. -
To setup detail technical specification and Bill of Quantities for the type and volume of work supposed to be executed.
Methodology
Methods
The methodologies followed were based on the objective stated earlier. The key stages of the activities are presented as pre-field work, field work and post field stages:
Pre Field Stage
At this stage, the following tasks have been carried out:
- Collection of remote sensing data such as Multispectral LANDSAT ETM+ Satellite Imagery, digital topographic elevation data of SRTM v.4 etc.
- Defining the extent of the study area and clipping the above data to the defined extent;
- Conducting a GIS spatial analysis on Digital Elevation Model (DEM) that is derived from SRTM v.4 so as to setup drainage network, watershed, drainage density, lineament density, slope steepness, aspect etc.
- Draping or superimposing multispectral satellite imagery onto Digital Elevation Model (DEM) so as to map the various hydro geomorphic features of the study area
- Collection of secondary data like previous as well as recent well drilling, pumping test as well inventory data, regional geological and hydrogeological map, hydro-meteorological data etc.
- Organizing the data through building geodatabases.
- Conducting spatial weighted overlay analysis on the above factor map so as to delineate the different groundwater potential zone of the area.
- Selection of possible VES points;
- Determining the field traverse line for field verification.
Field Work
All the data organized in the basemap has been authenticated and rectified through collecting ground truth data about the previously mapped features on the preselected traverse lines. This in turn helps to conduct accuracy assessment. Following vigilant field verifications and revision processes, the data in geodatabases as well as the corresponding factor maps have been updated.
Then forward, electrical methods of resistivity survey have been carried out on the pre-selected and again confirmed points which are assumed to throw light on the anomalies of subsurface geological formation.
Besides, at this stage the data collected from resistivity survey was processed and interpreted using interactive semi-automated software; IPI2Win version 3.0.1. The output from the interpretation helps to determine different geo-electrical layers with the corresponding resistivity and thickness. In other words, it aids to conduct qualitative interpretation through inferring the underlying geological formation by correlating the output with priory data and geological knowledge of the area. Finally, hydrogeological decision has been set and put in place through pinpointing abstraction point wherein the future provision of safe and adequate water supply is feasible.
Post Field Work
This stage is primarily accomplished through setting up draft report of the investigation finding which encompasses detail analysis done and presentation of the output with conclusion, recommendation, and preliminary borehole design, engineering estimation, technical specification and bill of quantities. In addition to this, preparation for presenting the finding and production of the final report after incorporating the comment from different source are included in post field work.
Figure 1: Flowchart showing the Study Methodology
Data, Materials and Software
The following remote sensing, primary as well as secondary data were used in the course of hydrogeological investigation for the selection of a backup drilling sites.
| No. | Item Description | Source |
|---|---|---|
| 1 | Topographic Map (1:50,000) | Ethiopia Mapping Agency (EMA) |
| 2 | 30m Resolution, 7-bands LANDSAT TM | Downloaded from Land Cover Facility Website |
| 3 | Geological Map of Ethiopia (1:2,000,000) | Geological Survey of Ethiopia |
| 4 | Previous Works Done in the Area | Different Sources |
| 5 | Regional Geological Map with Explanatory Notes | Geological Survey of Ethiopia |
| 6 | Regional Hydrogeological Map with Explanatory Notes | Geological Survey of Ethiopia |
| 7 | Subsurface Resistivity Data from the Vertical Electrical Sounding Survey (VES) | Collected from Field Survey |
| 8 | Ground Truth Data using GPS | Collected from Field Survey |
| 9 | Previous Drilling and Pumping Test Data, Well Inventory including Chemistry, etc | Afar Water, irrigation and energy Bureau, Wereda water, irrigation and energy office and Ministry of water, irrigation and energy |
Table 2: Data Used for the Investigation along with their Source
In addition to this, the following software and materials were primarily deployed for the investigation. These are:
- Global Mapper v.12
- ArcGIS v.10 (ArcInfo License)
- Surfer v.10
- IPI2Win version 3.0.1
- Microsoft Office Packages
- ABEM Therameter SAS1000
- GPS
- Laptop Computer
DESCRIPTION OF THE STUDY AREA
Location and Accessibility
The project sites are found Argoba, Liyu wered zone 03 in Afar Reginal state .
The administrative centers Gachene, towns which is found , 465, Kilometers south Semera town (Regional capital city) . The project sites are accessible through an Asphalted road stretching from Adiss Ababa to Djibouti, and Derebriha to Awash following new roads construction to the target sites.
| No. | X | Y | Wereda | Site Name |
|---|---|---|---|---|
| 2 | 597461 | 1057514 | Argoba | Gachene |
Table 3: Specific information of the project sites
Figure 2: Location Map of Dulesa and Gachene town well
Local Geology
Geology of Dulesa and Gachene area
Generally the geology of study area is characterized by three major groups of litho-stratigraphic sequence evolved during Tertiary and Quaternary periods of the Cenozoic Era.
From bottom to top
- Tertiary Volcanic Rocks
- Quaternary Sediments
- Quaternary Basalt
Tertiary Volcanic Rocks
The Tertiary volcanic rock exposed on the study area are Tarmaber megezez, Alajae formation and Afar stratoid series. It is the oldest volcanic rock in study area that occur on the western high lands, which were erupted from fissures due to extensional tectonic activity. The rocks consist of thick succession of aphanitic and vesicular basalts, rhyolites and ignimbrites.
Quaternary Sediments
The Quaternary sediments of the Afar Depression are mainly fluvial/lacustrine with thicknesses up to 200m in places (Varet, 1978). The formation belongs to Pleistocene and Holocene epochs of the Cenozoic Era. Lacustrine beds are interbedded with Plio-Pleistoce pyroclastics in the lakes’ region and on the rift shoulders (Mohr, 1966; Lloyd, 1980). The lacustrine beds are mostly redeposited volcanic sands, tuff with calcareous material and diatomite
They are widespread in the study area having a flat to gently topography. They are evolved mainly due to fluvial and alluvial process operated in the study area. The formation consists of alternating layers of gravel, sand silt with clay. The thickness of this formation is generally decreasing from pediment to the peniplain topography.
Quaternary Basalts
Quaternary volcanic rocks in the Afar Depression are composed of basaltic flows, scoria cones, and silicic rocks (Tefera et al., 1996). In most places basaltic fissure eruptions were followed by central eruptions that produced differentiates of basalt comprising alkaline and per-alkaline silicic rocks (Varet, 1978; Tefera et al., 1996). They get progressively younger from the marginal zones towards the axial zones (Barberi and Varet, 1977).
This rock unit is found exposed on the eastern part of the study area. It is highly porous and permeable.
Geological Structures
The major structures in the study area are NW-SE normal faults with variable strike length (few meters up to kilo meters). These structural elements within the study area are identified by the combination of results from Digital Elevation Model (DEM) analysis and field observations. The tectonic structures are associated with the extensional tectonics include faults, fractures and joints, having variable magnitude and orientations.
Figure 17: Geological Map of Dulesa and Gachene area
GEOPHYSICAL INVESTIGATION
The surface geological and hydrogeological observation is supported by taking measurements of the physical parameters of the subsurface of the earth. The method applied for this study is electrical resistivity method. The aim of electrical survey is to determine the surface resistivity distribution by making measurements on the ground surface. From these measurements layer parameters such as the true resistivity and thickness of the surface layers can be estimated from the interpretation. In general, resistivity allows the mapping of lateral and depth variation in subsurface resistivity and can these be used to make between discriminate geological units of different resistivity.
The resistivity measured at ground can be correlated with the various geological parameters such as porosity and degree of water saturation in the rock. Especially in hard rock terrain, faulting and weathering usually increase porosity and fluid permeability and hence lower resistivity of the formation. On the contrary, compaction and/or metamorphism will reduce porosity and permeability and hence increase resistivity. With the exception of clays and certain metallic ores, the passage of electrical current through rocks take place by way of the groundwater contained in the pores and fissures, the rock matrix being non-conducting.
The main objective of the geophysical survey conducted in the study area is for selection of borehole sites to advance safe and adequate groundwater in the area. In order to do so mapping of lineaments like fault, joint, fracture zones et cetera, which are believed to serve as a conduit for the percolation as well as circulation of groundwater, are done through performing digital image processing on the multi-spectral LANDSAT ETM+ satellite image. Moreover, as clearly described on the methodology of this study, integrated remote sensing and GIS application supported by selective field authentication facilitates to map the different factors that control the availability or occurrence of groundwater in the area and thus using spatial weighted overlay analysis, it was possible to delineate the study area in terms of the different potential zones. The output from the analysis, i.e. Groundwater Potential Zone Map, helps to select and pinpoint Vertical Electrical Sounding (VES) survey points which are presumed to portray significant anomalies within subsurface geological formation of the area.
By and large, a geophysical method of an electrical resistivity survey was conducted in the area with the following specific objectives:
- Mapping the vertical or depth wise variation of apparent resistivity of the subsurface formation
- To determine the thickness of the overburden materials at different survey points;
- To determine the thickness of a water bearing zone (aquifer) at different survey points;
- To approximate the depth to the bedrock in the area.
- To identify and pinpoint the best well field for groundwater exploitation
- To setup initial borehole design encompasses the estimated depth and diameter of drilling, the material and length of perforated and blind casing to be installed, type and size gravel to be packed etc.
The instrument used for this investigation was ABEM Terameter SAS 1000, electrical resistivity method with transmitter and receiver integrated in one unit that displays the resistance in ohms.
The Schlumberger electrode configuration was used for the sounding survey. Resistivity measurements are made, by injecting current into ground through two current electrode (CI and C2) and measuring the resulting voltage different (that is caused by surface variation in conductivity which alerts the form of the current flow within the earth) at two potential electrodes (P1 and P2). The degree to which it is affected depends on the size, shape, location and electrical resistivity of the surface layers or bodies. It is therefore possible to obtain information about the surface from potential measurements made at the surface. Series measurements are taken by progressively increasing the current electrode separation (AB) thereby increasing the depth of investigation. The maximum current electrode separation (AB) used in this study is 1000m. so that is enabled us to have deep to moderate depth of investigation.
From knowledge of the potential drop, current and electrode spacing, the ground resistivity can be calculated. The calculated resistivity value is not the true resistivity of the subsurface. But it is an apparent value. To determine the subsurface resistivity value, an inversion of the measured apparent resistivity using a computer program (software) must be carried out. The measured resistivity values are normally plotted on a log-log graph paper.
The computer software type used for the interpretation of VES data is IP12 Win-Resistivity Sounding Interpretation Software. Moscow State University, Version 3.0.1 (1990 – 2003). The inversion algorithm then adjusts the starting model in a number of iterations until a satisfactory best fit (with least root mean square error) is obtained between the field observed and calculated sounding curves.
Due to the well-known problems of equivalence and suppression, the best-fit model may not necessarily agree with the geology of the area under investigation. Thus, by considering the available geological information (geological log of the boreholes drilled previously), attempts have been made to modify the interpretation so that the geophysical results agree with the local geology. The process of modifying layer parameters and inclusion/deletion of new layers continued until a perfect match between field and theoretical curves is obtained. This has also made possible the interpretation of the various geo-electric layers in terms of lithology.
Since resistivity surveys give a picture of the subsurface resistivity distribution in the form of geo-electric section, Knowing typical resistivity values for different types of subsurface materials and the geology of the surveyed area is important to convert the resistivity picture into a geological as well as hydrogeological ones.
Generally, the Vertical Electrical Sounding (VES) Survey was conducted in the study areas where anomalies are expected and terrain slopes are convenient with the possible access roads. The output of the analysis is presented here in the report for the VES points that are later pinpointed.
| No. | Wereda | Site Name | VES Index | X | Y |
|---|---|---|---|---|---|
| 2 | Argoba | Gachene town | VES 1 | 596402 | 1057621 |
| 3 | Argoba | Gachene town | VES 2 | 597435 | 1057532 |
| Layer No. | Apparent Resistivity (?m) | Thickness (m) | Depth (m) | Inferred Lithology |
|---|---|---|---|---|
| 1 | 648 | 0.704 | 0.704 | Sandy gravel |
| 2 | 107 | 2.86 | 3.57 | Moderately weathered and fractured volcanic rock |
| 3 | 31.1 | 15.1 | 18.7 | Highly weathered and fractured volcanic rock |
| 4 | 3.72 | 14.5 | 33.3 | Clay |
| 5 | 109 | 43.9 | 77.1 | Moderately weathered and fractured volcanic rock |
| 6 | 0.0434 | ? | Water bearing highly weathered and fractured volcanic rock |
| Layer No. | Apparent Resistivity (?m) | Thickness (m) | Depth (m) | Inferred Lithology |
|---|---|---|---|---|
| 1 | 59.2 | 0.847 | 0.847 | Silty clay |
| 2 | 42.4 | 3.02 | 3.87 | Sandy gravel |
| 3 | 4.27 | 3.84 | 7.71 | Silty sand |
| 4 | 16.8 | 11.4 | 19.1 | Sand |
| 5 | 3.32 | 20.7 | 39.8 | Clay/ highly weathered and fractured volcanic rock |
| 6 | 24.2 | 49.1 | 88.9 | Water bearing highly weathered and fractured volcanic rock |
| 7 | 1.52 | 88.4 | 177 | Water bearing highly weathered and fractured volcanic rock |
| 8 | 726 | ? | Massive volcanic rock |
Table 21: ECE for deep well drilling and construction on Gachene town
Engineering Cost Estimation for Gachene town Deep Well Drilling, Construction and Testing
Project Name: Gachene town Water Supply Project
Project Type: Water Well Drilling, Construction with Pumping Test
Geographic Position (Based on UTM Projection & WGS 84 Datum)
X: 597461, Y: 1057514
Target Depth: 250m
| Item No. | Description | Unit | Qty. | Rate | Amount | |
|---|---|---|---|---|---|---|
| 1 | GENERAL | |||||
| 1.1 | Inter site mobilization | LS | 1 | 150,000.00 | 150,000.00 | |
| 1.2 | Site clearing before and after execution | LS | 1 | 50,000.00 | 50,000.00 | |
| Sum of Item No. 1 | 200,000.00 | |||||
| 2 | BOREHOLE DRILLING | |||||
| 2.1 | Soft formation, ? = 20 | M | 10 | 17,000.00 | 170,000.00 | |
| 2.2 | All formation, ? = 14 | M | 240 | 15,000.00 | 3,600,000.00 | |
| 2.3 | Lithological logging | LS | 1 | 30,000.00 | 30,000.00 | |
| 2.4 | Electrical (Resistivity) logging | LS | 1 | 85,000.00 | 85,000.00 | |
| Sum of Item No. 2 | 3,885,000.00 | |||||
| 3 | SUPPLY, INSTALLATION AND CONSTRUCTION | |||||
| 3.1 | Steel surface casing, ? = 16 | M | 10 | 14,000.00 | 140,000.00 | |
| 3.2 | Steel blind casing, ? = 10 | M | 160 | 21,000.00 | 3,360,000.00 | |
| 3.3 | Steel screen casing, ? = 10 | M | 90 | 22,000.00 | 1,980,000.00 | |
| 3.4 | Steel observation pipe, ? = 3/4 | M | 200 | 700 | 140,000.00 | |
| 3.5 | Supply and pack selected gravel | M3 | 13 | 15,000.00 | 195,000.00 | |
| 3.6 | Well head construction (1:2:2) | LS | 1 | 40,000.00 | 40,000.00 | |
| 3.7 | Grouting with mass concrete | LS | 1 | 20,000.00 | 20,000.00 | |
| 3.8 | Supply and weld steel cover on top of borehole | LS | 1 | 5,000.00 | 5,000.00 | |
| Sum of Item No. 3 | 5,880,000.00 | |||||
| 4 | DISCHARGE TEST AND MISCELLANEOUS | |||||
| 4.1 | Well cleaning and development | Hr. | 8 | 15,000.00 | 120,000.00 | |
| 4.2 | Conducting pre test | Hr. | 3 | 7,000.00 | 21,000.00 | |
| 4.3 | Conducting step drawdown test | Hr. | 8 | 7,000.00 | 56,000.00 | |
| 4.4 | Conducting constant discharge test | Hr. | 48 | 7,000.00 | 336,000.00 | |
| 4.5 | Monitoring recovery test | Hr. | 24 | 3,000.00 | 72,000.00 | |
| 4.6 | Physico-chemical analyses of water samples | Nr. | 1 | 40,000.00 | 40,000.00 | |
| 4.7 | Production of well completion reports | Nr. | 4 | 10,000.00 | 40,000.00 | |
| Sum of Item No. 4 | 685,000.00 | |||||
| Total | 10,650,000.00 | |||||
| VAT (15%) | 1,597,500.00 | |||||
| Grand Total | 12,247,500.00 | |||||
| VAT (15%) | 1,837,125.00 | |||||
| Grand Total | 14,084,625.00 |


